Fakta om udbudet
Udbyder
Gas Storage Denmark A/S
Market dialogue - Wireline cleaning tool
Gas Storage Denmark A/S
Periodic indicative notice – utilities
This notice is a periodic indicative notice only
Services
Section I: Contracting entity
National registration number: 29851247
Postal address: Tonne Kjærsvej 65
Town: Fredericia
NUTS code: DK Danmark
Postal code: 7000
Country: Denmark
Contact person: Procurement - A
E-mail: procurement@energinet.dk
Telephone: +45 70102244
Internet address(es):
Main address: https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
Address of the buyer profile: https://eu.eu-supply.com/ctm/Company/CompanyInformation/Index/228008
Section II: Object
Market dialogue - Wireline cleaning tool
Gas Storage Denmark plans a well operation in the natural gas salt cavern well To-8 for Q3 2023 at which the production string will be replaced. The anchor seal of the packer will be removed, and before installation of a new anchor seal assembly the seal area needs to be cleaned as good as possible. The project aims to gain knowledge about the tools on the market for this operation.
Rækkeborgvej 4, 9620 Aalestrup
Gas Storage Denmark plans a well operation in the natural gas salt cavern well To-8 for Q3 2023 at which the production string will be replaced. The anchor seal of the packer will be removed, and before installation of a new anchor seal assembly the seal area needs to be cleaned as good as possible. The project aims to gain knowledge about the tools on the market for this operation.
Technical information, attached files:
Appendix 1) - To-8 Completion Schematic // The completion of To-8 before the put of the production string
Appendix 2) - Well Schematic To-8 // The well incl. the cut of the production string at TVD 952.13-952.53 m
The project search for tools that can clean the anchor seal area by brushing without scratching the surface of the anchor seal area. The tool is preferrable at brush with the optimal shape and hardness that can rotate and reach the casing with some force. The project would like to know how the tools on the market can meet these functional requirements.
Beside this does the tool string also have to be suitable for the casing: the tool string shall be able to pass all restrictions incl. restriction due to the misalignment of the production string at the cut.
As part of this dialogue with the market the project will also like to gain knowledge of cleaning tools for the cleaning of the top of a plug in the tail pipe and inside the tailpipe after pulling the plug. The liquid/dirt/debris to be cleaned out is expected to be brine with debris/grease.
Technical information, attached files:
Appendix 3) - Tail pipe cleaning //Details of area to bed cleaned at TVD 965.83 to 972.21 m